Whole-home remodeling in New York City
Cost vs. Value doesn't price a whole house, but its 2025 New York figures put a major midrange kitchen at $90,2521, a midrange bath at $30,3761 and a basement remodel at $61,4171. What shapes a gut renovation here is the paperwork before demolition: an architect or engineer files the plans with the Department of Buildings, an asbestos investigator has to clear the work first, and a job that changes the building's use, exits or occupancy ends with a new Certificate of Occupancy.
Calls are recorded. One independent company that handles whole-home remodels in the New York City area answers.
Updated October 12, 2026

Pricing the rooms a renovation reaches
Cost vs. Value surveys single projects, and its 2025 New York page is the newest local edition. Four jobs a full renovation often bundles are set here against the national averages.
| Measure | New York market | U.S. average |
|---|---|---|
| Major midrange kitchen remodel, job cost | $90,2521 | $82,7932 |
| Midrange bathroom remodel, job cost | $30,3761 | $26,1382 |
| Basement remodel, job cost | $61,4171 | $52,0122 |
| HVAC conversion (electrification), job cost | $23,7691 | $19,4843 |
Every row runs above the national figure. Design fees, the asbestos survey and DOB filing costs sit outside these job prices, so ask for them as their own lines before you compare quotes.
How old the walls are
Citywide, most homes were built before 1960. Staten Island, the comparison borough on this page, did far more of its building after the war, so its houses tend to be younger than the city's.
| Measure | New York City | Staten Island |
|---|---|---|
| Homes built before 1980 | 79%4 | 60%4 |
| Homes built before 1960 | 60%4 | 31%4 |
| Homes built before 1940 | 38%4 | 18%4 |
Gutting a prewar row house or apartment usually uncovers plaster on lath, cast-iron drains and wiring sized for a handful of lamps. A Staten Island house from the sixties or seventies tends to hide less, but its electrical panel and its old resilient flooring still deserve a look before work is priced.
Houses, two-families and towers
Census counts of units per building show what kind of renovation is even possible. Detached houses are a thin slice of the city's homes and a much thicker one on Staten Island, where small multi-family buildings are common too.
| Measure | New York City | Staten Island |
|---|---|---|
| Single-family detached homes | 9%5 | 35%5 |
| Homes in buildings with two to four units | 21%5 | 26%5 |
| Homes in buildings with 50 or more units | 33%5 | 7%5 |
Only the owner of a whole building can renovate it from cellar to roof. For a co-op or condo apartment, the building's own alteration process runs alongside DOB's, so ask the managing agent for its rules before drawings start.
What heats the home today
Census heating-fuel counts show utility gas heating most homes in both places. Staten Island leans on gas even harder, with smaller shares heated by electricity or oil.
| Measure | New York City | Staten Island |
|---|---|---|
| Occupied homes heated with utility gas | 64%6 | 85%6 |
| Occupied homes heated with electricity | 17%6 | 7%6 |
| Occupied homes heated with fuel oil or kerosene | 11%6 | 4%6 |
Trading a gas or oil boiler for heat pumps usually means a bigger electrical service as well. The New York market's heating electrification job came to $23,7691 in the 2025 report, before any service upgrade.
The renovation against the home
The Census median covers every owner-occupied home, co-op and condo apartments included. Staten Island's median sits below the citywide figure.
The trades a gut job keeps busy
BLS publishes no May 2025 table for the New York City division alone, so these are medians for the New York–Newark–Jersey City metro. Each trade here earns more than its national median.
| Measure | New York metro | United States |
|---|---|---|
| Carpenters, median hourly wage | $35.72/hr8 | $29.12/hr8 |
| Electricians, median hourly wage | $37.99/hr8 | $30.38/hr8 |
| Plumbers, median hourly wage | $37.79/hr8 | $30.67/hr8 |
On a full renovation the plumber and electrician return for rough-in, inspection and finish, and in this city both must hold DOB licenses to file their permits. Grouping several rooms into each of those visits saves paid trips at these rates.
Permits
A full renovation in New York City runs through the Department of Buildings. A registered architect or engineer files the plans, and DOB sorts the job as an Alteration or, when it changes the building's use, exits or occupancy, an Alteration-CO that ends with a new Certificate of Occupancy. Before any permit, an asbestos investigator has to clear the work, the plans must meet the city's Energy Conservation Code, and plumbing and electrical permits go in under licensed trades.
- The majority of construction in New York City needs a DOB permit, and the plans must be filed by a New York State registered architect or licensed professional engineer, who submits the application and drawings.9
- DOB files most renovation work as either an Alteration-CO, for a major alteration that will change a building's use, exits or occupancy, or an Alteration, for work that doesn't.9
- In New York City, an existing building needs a current or amended Certificate of Occupancy when work changes its use, exits or type of occupancy, and no one may legally occupy a building until DOB issues a CO or a temporary CO.10
- Owners must show DOB that asbestos requirements have been met before a DOB permit can be issued, and where abatement is needed they must hire a licensed abatement contractor and an independent air-monitoring firm.11
- New York City has had its own Energy Conservation Code since July 2010, and it applies to all alterations, so adding onto or renovating a home means meeting it, sometimes with extra requirements the architect or engineer must build into the plans.12
- In New York City, any work that alters, rearranges, relocates or permanently removes piping must be supervised by a Licensed Master Plumber, who obtains the permits from DOB and arranges the tests and inspections.13
- New York City requires an electrical permit for most electrical work in a home, the work must be done by electrical contractors licensed by DOB, and the filings are submitted in DOB NOW: Build.14
Checked October 12, 2026
Before you hire
New York has no statewide contractor license, so check the city or county home improvement license where one is required, and make sure any job over $50033 comes with the written contract state law calls for.
Talk to a pro who handles whole-home remodels in New York City
Calls are recorded. You'll be connected to one independent company that handles whole-home remodels in your area. We never call or text you. Privacy Policy ·Do Not Sell or Share My Personal Information
Lead paint and old pipes behind the plaster
With 60%4 of the city's homes built before 1960, a whole-home renovation almost always disturbs old paint. HPD says that in a New York City building built before 1978, lead-safe work practices should be used for any repair or renovation that disturbs 2 square feet or more of paint in a room, 10 percent or more of a small component, or involves removing windows, whether or not children live there.15 Under Local Law 1 of 2004, all paint in a pre-1960 multiple-dwelling apartment where a child under 6 lives, and in the building's common areas, is presumed to be lead paint, and any repair or renovation there that disturbs it must follow the city's work practices and use trained workers.16
New York City's water report says homes built before 1961 may have lead service lines connecting the building to the city main, and that property owners own and are responsible for their service lines.17 While floors and walls are open, replacing the service line and any galvanized supply pipe inside your own walls costs far less than it will once the finishes go back. The EPA notes that lead can collect inside galvanized pipe and later reach drinking water, and that solder made before 1986 contained high levels of lead.18
Asbestos comes before the permit
In New York City, an owner planning a renovation, alteration or demolition is responsible for finding out whether asbestos is present where the work will reach, and a DEP Certified Asbestos Investigator determines whether any must be removed before work begins.11 If a Certified Asbestos Investigator finds the work is not an asbestos project, an Asbestos Assessment Report (form ACP-5) is filed with DEP and verified by DOB before the permit moves ahead; if it is an asbestos project, an Asbestos Project Notification (form ACP-7) goes to DEP instead.19
Beyond flooring, the EPA lists vermiculite attic and wall insulation, roofing and siding shingles, textured paint and patching compounds on walls and ceilings, and hot water and steam pipes wrapped in asbestos blanket or tape among the places asbestos may be found in a home.20 In a city house that can mean the wrap on cellar steam pipes, floor tile hiding under carpet and textured ceilings, so book the survey before setting a demolition date. DEP says skipping the asbestos survey before work starts, or failing to use a licensed abatement contractor who files the project, can bring penalties of $1,200 to $10,000 per infraction, and asbestos projects must be filed with DEP at least 7 days before they start.21
Alteration or Alteration-CO
In DOB NOW, the old Alteration Type 1 job is now called Alteration CO, and the old Alteration Type 2 and Type 3 jobs are both filed as Alteration.22 When an Alteration is filed in DOB NOW, a yes to any one of its questions, including whether the work changes occupancy or use, makes a major change to exits, changes the number of stories or is inconsistent with the current CO, means the job ends in a Certificate of Occupancy rather than a Letter of Completion.22
DOB issues a final Certificate of Occupancy when completed work matches the submitted plans for a new building or major alteration, and a Letter of Completion for minor alterations that don't need a new or amended CO.10 Buildings built before 1938 aren't required to have a Certificate of Occupancy unless later alterations changed their use, exits or occupancy; for proof of legal use, the DOB borough office can issue a Letter of No Objection.10 Ask the architect early which path your plans will take, because a CO job adds inspections and sign-offs at the end of the schedule.
New York City has had its own Energy Conservation Code since July 2010, and it applies to all alterations, so adding onto or renovating a home means meeting it, sometimes with extra requirements the architect or engineer must build into the plans.12 New York City enacted an Existing Building Code on January 17, 2026, taking effect July 17, 2027; until then, alterations to existing buildings follow the Administrative Code and the 2022 construction codes, with the 1968 code available at the owner's option for older buildings.23
Landmark districts and flood zones
Interior work in a landmark building generally doesn't need Landmarks Preservation Commission review unless it requires a DOB permit, affects the exterior, or is in a designated interior landmark.24 The Landmarks Preservation Commission issues a Certificate of No Effect through its Portico portal, without a public hearing, for work such as interior renovations that need DOB permits and the installation of plumbing and heating equipment.25 A renovation that adds a rear extension, new front windows or rooftop equipment reaches the outside of the building, so confirm whether it is designated before the drawings are finished.
DOB is the city's floodplain administrator, and an existing building in the floodplain that undergoes a substantial improvement, or was substantially damaged, must be brought fully up to the flood-zone rules as if newly built, which for a home includes raising living space and filling basements or cellars to grade.26 On a low-lying block near the water, that rule can decide how much renovation is worth doing in one go.
Living through the work
For very dusty work such as demolition, the EPA describes isolating the work area: sealing it off with no direct access to the occupied rooms, with workers using a separate entrance until cleanup is done.27 In a brownstone or a two-family house, owners often camp on an upper floor while the crew takes the parlor or garden level, a plan that only works if one bathroom and a kitchen sink stay running upstairs.
If the job changes exits or the number of units, nobody may legally move back in until DOB signs off with a new or temporary CO, so build that inspection into the move-in date.
Building in room to stay
More than one in four adults 65 and older fall each year.28 With the walls already open, blocking for future grab bars, a wider bathroom door and a step-free shower on the entry floor add little to a gut renovation. NAHB's Certified Aging-in-Place Specialist (CAPS) credential trains remodelers in home modifications for aging in place.29
What happens when you call
The number on this page connects you, on a recorded line, with one independent company that handles whole-home remodels in the New York City area. Which floors, in what order and for what price are settled between you and that company.
That company pays us for the call. It costs you nothing, and nobody from our side phones or texts you afterward. How we make money
After you're connected
New York City licenses home improvement contractors through DCWP, so look the company up before you sign. New York City requires a Department of Consumer and Worker Protection Home Improvement Contractor license for residential construction, repair or remodeling work that costs more than $200; new construction, plumbing and purely electrical work are not covered.30 DCWP's online Search Business tool shows whether a business or individual holds a DCWP license, without logging in, and can be searched by name or DCWP license number.31 Check a New York license
If a New York home improvement contract has progress payments, it must list each payment in dollars and cents and the stage of work it pays for, and each payment must bear a reasonable relationship to the work done, materials bought or expenses owed at that point.32 A New York homeowner may cancel a home improvement contract until midnight of the third business day after signing, by written notice that shows they don't intend to be bound; the right doesn't apply when the owner called the contractor for a bona fide emergency and signed a handwritten waiver.32
Questions people ask
What does a whole-home renovation cost in New York City?
Cost vs. Value prices rooms, not whole homes. Its 2025 New York figures list a major midrange kitchen at $90,2521, a midrange bath at $30,3761 and a basement remodel at $61,4171. Design fees, asbestos work and any electrical service upgrade come on top.
Will my renovation need a new Certificate of Occupancy?
Only if it changes the building's use, exits or occupancy, or conflicts with the CO you have. When an Alteration is filed in DOB NOW, a yes to any one of its questions, including whether the work changes occupancy or use, makes a major change to exits, changes the number of stories or is inconsistent with the current CO, means the job ends in a Certificate of Occupancy rather than a Letter of Completion.22
Do I need an asbestos check before demolition?
Yes, DOB won't issue the permit without it. Owners must show DOB that asbestos requirements have been met before a DOB permit can be issued, and where abatement is needed they must hire a licensed abatement contractor and an independent air-monitoring firm.11
My house was built before 1938 and has no CO. Is that a problem?
Not on its own. Buildings built before 1938 aren't required to have a Certificate of Occupancy unless later alterations changed their use, exits or occupancy; for proof of legal use, the DOB borough office can issue a Letter of No Objection.10
Sources
Page updated October 12, 2026. How we source our numbers
- Zonda / Journal of Light Construction, Cost vs. Value 2025, New York, NY. Released 2025. New York, NY (Cost vs. Value market). Industry source.
- Zonda / Journal of Light Construction, Cost vs. Value 2025, national. Released 2025. United States. Industry source.
- Zonda / Journal of Light Construction, Cost vs. Value 2025, Washington, DC. Released 2025. United States. Industry source.
- U.S. Census Bureau, American Community Survey 2020–2024 5-year, table B25034. Released January 29, 2026. New York City, NY, Staten Island (Richmond County), NY.
- U.S. Census Bureau, American Community Survey 2020–2024 5-year, table B25024. Released January 29, 2026. New York City, NY, Staten Island (Richmond County), NY.
- U.S. Census Bureau, American Community Survey 2020–2024 5-year, table B25040. Released January 29, 2026. New York City, NY, Staten Island (Richmond County), NY.
- U.S. Census Bureau, American Community Survey 2020–2024 5-year, table B25077. Released January 29, 2026. New York City, NY, Staten Island (Richmond County), NY.
- U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025. Released May 15, 2026. New York-Newark-Jersey City metro, Carpenters, United States, Electricians, United States, Plumbers, United States.
- NYC Department of Buildings, Obtaining a Permit. No publication date. View source.
- NYC Department of Buildings, Certificate of Occupancy. No publication date. View source.
- NYC Department of Buildings, Asbestos & Abatement Permit. No publication date. View source.
- NYC Department of Buildings, Energy Code Compliance. No publication date. View source.
- NYC Department of Buildings, Plumbing Permits. No publication date. View source.
- NYC Department of Buildings, Electrical Permit. No publication date. View source.
- NYC Department of Housing Preservation and Development, Safe Work Practices. No publication date. View source.
- NYC Department of Housing Preservation and Development, Guide to Local Law #1 of 2004 Work Practices. Released December 2023. View source.
- New York City Department of Environmental Protection, 2025 Drinking Water Supply and Quality Report. Released 2026. View source.
- U.S. Environmental Protection Agency, Sources of Lead in Drinking Water. Released August 2017. View source.
- NYC Department of Buildings, Project Requirements: Asbestos. No publication date. View source.
- U.S. Environmental Protection Agency, Learn About Asbestos. Released July 13, 2026. View source.
- NYC Department of Environmental Protection, Asbestos Abatement. No publication date. View source.
- NYC Department of Buildings, Job Types in DOB NOW (naming conventions, BIS vs. DOB NOW: Build). No publication date. View source.
- NYC Department of Buildings, Existing Building Code. Released 2026. View source.
- NYC Landmarks Preservation Commission, Landmark Designation (FAQ). No publication date. View source.
- NYC Landmarks Preservation Commission, Certificate of No Effect. No publication date. View source.
- NYC Housing Recovery Office, Resources: Department of Buildings. No publication date. View source.
- U.S. Environmental Protection Agency, Best Practices for Indoor Air Quality when Remodeling Your Home. Released June 23, 2026. View source.
- Centers for Disease Control and Prevention, Facts About Older Adult Falls. Released September 4, 2026. View source.
- National Association of Home Builders, Certified Aging-in-Place Specialist (CAPS). No publication date. View source. Industry source.
- NYC Department of Consumer and Worker Protection, Wall of Shame: Unlicensed Home Improvement Contractors. Released October 1, 2026. View source.
- NYC Department of Consumer and Worker Protection, Check a License. No publication date. View source.